Customization: | Available |
---|---|
Certification: | VDE, CCC, ISO9001 |
Shell Material: | Stainless Steel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
With the continuous development and progress of society, great changes have taken place in China's urban power grid. Most cities have formed or are forming a large number of electricity load intensive areas. In the past, the power supply from the substation 12/24kV line (or branch line) to the direct user has been difficult to meet the requirements of urban development. Therefore, a new power supply method is produced by opening and closing the power supply to the user. However, with the intensification of urban densification, some of the original civil construction closures have been restricted by land and urban planning. Therefore, a more advanced and practical outdoor high-pressure ring cage (standardized) has emerged. The product does not need civil construction and occupies a small area, the configuration is very flexible, and the power supply is more reliable; The time of construction, installation and commissioning is greatly shortened, and the overall cost is reduced.
With the development of modern industry, the degree of automation and intelligence of electrical control equipment is getting higher and higher. The use of modern electronic technology, sensor technology, communication technology, computer network technology, the power equipment under normal and accident conditions of monitoring, protection, control, measurement and other integration. To achieve good management in this way has become an inevitable trend and development direction.
Outdoor high pressure ring cage (standardized) is the use of foreign advanced technology. It will be 12/24kV switchgear, circuit breaker, load switch, current and voltage transformer, 12/24kv power supply PT, FTU,RTU, communication control terminal (CCu), 12/24kV metering and automatic meter reading, USP power supply and indicating instruments installed and adjusted into a movable, sealed moisture-proof stainless steel box. Thus, the integration of the primary and secondary systems of the urban distribution network and the modularization of the assembly are realized, the construction period is shortened, and the reliability of the operation of the urban power network is greatly improved.
Item |
Unit |
Load switchgear/combined electrical cabinet |
||
Rated peak withstand current |
kA |
50/63 |
||
Closed-loop breaking current |
A |
630 |
||
Rated charging breaking current of the current |
A |
25 |
||
Rated no-load transformer breaking current |
A |
16 |
||
Rated breaking transfer current |
A |
1750 |
||
Expected short circuit breaking current (RMS) |
kA |
63 |
||
Ground switch short-time withstand current / duration |
kA |
25kA/1s |
||
Number of times the rated current is broken |
time |
≥200 |
||
Mechanical life |
time |
≥200o |
||
Annual leakage rate of SF6 gas |
|
<1% |
||
Rated breaking transfer current |
A |
1750 |
||
Rated insulation level |
1min power frequency withstand voltage |
Between open contacts |
kv |
48 |
(Effective value) |
Interphase |
kv |
42 |
|
|
Opposite |
kv |
42 |
|
Lightning impulse withstand voltage |
Between open contacts |
kv |
85 |
|
(Peak value) |
Interphase |
kv |
75 |
|
|
Opposite |
kwv |
75 |
|
Spring operating mechanism |
|
Manual (Can be upgraded to electric) |
||
Operating voltage |
v |
DC48V/ AC220V |
||
Outer insulation creepage ratio |
mm/kv |
≥20 |
||
Different periods of opening |
ms |
<5 |
||
Different periods of closing |
ms |
<5 |
||
Main loop resistance |
uΩ |
<140 |
||
Shell protection level |
|
IP4x |
Q 1. Are you factory?
A.YES, Welcome to visit our company and factory.
Q 2. How's the delivery time?
A. Usually it will take about 7-30 days for MOQ
Q 3.Can you design customer's packing?
A.YES.We can customized the package for you.
Q 4.Do you have abilityfor OEM/0DM cooperation?
A.OEM/ODM cooperation is welcomed. And we have full experience about them.
Q 5.We wants to know month capacity.
A. lt depends on which model. Generally, month capacity can reach near 100,000pcs.